City Projects

There are 27 results.

Klimaneutrale Stadt

SAFE - Creating a safe school environment together

Tactical urbanism for the temporary redesign of school surroundings to reorganize school mobility in a participatory process. The resulting catalogue of measures will serve as a blueprint for an implementation at other schools in Austria.

Klimaneutrale Stadt

QualitySysVillab - Protecting sustainable qualities in neighbourhood developments through process control and new digital methods

Development of a process concept to bring sustainable qualities in neighbourhood development from the intention and announcement level to the built reality. The process is supported by digital methods of energy and structural design and evaluated in the context of a case study.

Klimaneutrale Stadt

Mission2030 – Climate-neutral Smart City Klagenfurt 2030

As Austria's only city, Klagenfurt is part of the EU Cities Mission 2030. Along with Rome, Barcelona, Laibach and other European cities, the Carinthian state capital has set itself the goal of being climate neutral by 2030. A project that is not utopia, but quite realistic! An essential component and backbone of this mission is the Austrian Pioneer Cities Program.

Klimaneutrale Stadt

Carbon Accounting Pioneer Cities - carbon accounting and climate neutral cities

With the mission climate neutral cities the Federal Ministry of Climate Action, Environment, Energy, Mobility, Innovation and Technology has set a focus that will accelerate the achievement of climate and energy goals through research, technology and innovation. As part of this mission, the Environment Agency Austria will accompany and support the pioneer cities in creating a harmonized GHG balance sheet for cities. The harmonized GHG accounting forms the basis for the targeted alignment of strategies and measures to achieve climate neutrality in cities and communities.

Klimaneutrale Stadt

Climate neutrality roadmap St. Veit/Glan

St. Veit/Glan aims at advancing to a beacon for other small Austrian towns by developing strategies, measures and for building the capacity, necessary for achieving climate neutrality by 2040.

Klimaneutrale Stadt

Wiener Neustadt Climate neutral

Wiener Neustadt as a pioneering city, is making a conscious and ambitious transition towards climate neutrality. This complex transformation requires different measures. The measures shall both be developed in-house or developed by others and transferred to Wiener Neustadt. The effect of the entire bundle of measures from the different areas (e.g. governance, implementation districts, learning environment or energy, mobility, buildings, etc.) is subject to fact-based climate monitoring.

Klimaneutrale Stadt

Linz with Ambitio3xn - Linz with ambition for climate neutrality: governance, infrastructure and climate-social neighborhood Franckviertel

The project "Linz with Ambitio3xn" supports the city of Linz in becoming climate neutral by 2040. Contributing to this ambitious goal requires aligning urban planning instruments with urban climate mitigation and decarbonizing existing gas infrastructure in the Franckviertel neighborhood. In the project, standards for net zero non-profit housing will be tested in practice and shared learning are promoted.

Klimaneutrale Stadt

Climate prevention model Feldbach 1.0

In Austria, Feldbach counts to the active players in the field of climate policy. It has already implemented numerous projects in the areas of climate protection and energy.

Klimaneutrale Stadt

Bregenz 2040 climate neutrality roadmap focussing on the electricity and heating transition, mobility and public acceptance

The central goal of the project is to create a consistent, comprehensive, and feasible roadmap to achieve climate neutrality in Bregenz by 2040.

Klimaneutrale Stadt

Kapfenberg_2_zeroCO2 - Creation of the 2040 climate neutrality plan for the industrial city of Kapfenberg

For the industrial city of Kapfenberg in Upper Styria with over 22,000 residents, achieving climate neutrality is both challenging and necessary. The companies of Kapfenberg have been heavily reliant on fossil fuels. Implementation of climate protection measures is essential for their future viability and for maintaining a high quality of life for the population of Kapfenberg.

Klimaneutrale Stadt

Climate turnaround Bruck - Climate neutrality roadmap 2040 for the Bruck an der Mur conurbation to mitigate conflicts of use

The city sees the creation of a climate neutrality roadmap by 2040 as an opportunity to resolve existing conflicts of use. The implementation plan is to be developed in a participatory manner with short, medium and long-term solutions.

Klimaneutrale Stadt

City – Country – Climate: Four districts, one joint roadmap for a climate-neutral Gratwein-Straßengel

The aim is to initiate a structured and effective path towards climate neutrality 2035+ in the market town. In the context of the project, climate neutrality includes the topics of neighbourhoods and buildings, mobility and energy.

Klimaneutrale Stadt

Klimapionierstadt Wien

Systemic learning, accelerated knowledge transfer and new capacities as well as innovative impulses and the more ambitious design of ongoing activities will help to align the processes of the Vienna City Administration in a way that best supports the achievement of climate neutrality and resilience by 2040. The Klimapionierstadt Wien Partnership also contributes to putting selected pilot neighbourhoods on the path to climate neutrality by 2030.

Klimaneutrale Stadt

STPionier - St. Pölten: From industrial city to climate pioneer city

Until the year 2022, the city of St. Pölten did not have a strategy or concept that dealt decisively with the climate crisis. One of the reasons for this was the lack of a responsible department in the St. Pölten administration. With the pioneer city process, a staff unit has now been established that takes on climate agendas and introduces and promotes them in municipal processes and projects.

Klimaneutrale Stadt

Baden climate neutral - Climate neutrality roadmap Baden near Vienna

The city aims to become climate-neutral by 2040.

Klimaneutrale Stadt

Tulln Climate Neutral City 2040 (Tulln2040)

The core of the project is the development of a systemic strategy at a city-wide level that shows how the city of Tulln will achieve climate neutrality by 2040.

Klimaneutrale Stadt

Villach KlimaFit - Municipal Transformation Process to Achieve Climate Neutrality in Villach

The strategic framework for achieving climate neutrality has been decided in Villach and the city itself can already point to good results in its own sphere of action (buildings, photovoltaics). However, the lack of own energy and mobility operations, the type and scope of construction/investment projects (third-party projects) and the limited scope for action in strategic development topics (little land owned by the city of Villach) require the adaptation (transformation) of municipal instruments in order to implement climate neutrality holistically.

Klimaneutrale Stadt

Climate neutral Wiener Neustadt 2040

Wiener Neustadt wants to develop its own vision and implementation strategy for climate neutrality by 2040 and develop it in four steps.

Klimaneutrale Stadt

EnerPHit-for-2040 - EnerPHit for a climate-resilient St. Johann

St. Johann wants to set an example for other municipalities by developing a climate roadmap with feasible and financially viable measures.

Klimaneutrale Stadt

Pioneer City - Partnership for Climate Neutral Cities 2030

With its participation in the "Mission:Klimaneutrale Stadt", the City of Innsbruck is pursuing the goal of setting the course for achieving climate neutrality. In addition to the creation of structures within the city administration, climate-effective measures are being tested in the existing "Eichhof"-residential quarter together with the stakeholders. Successful measures shall then be implemented throughout the city. The intensive exchange with the other pioneer cities, the conscious use of synergy and the associated broad spectrum of knowledge and experience are necessary resources for the implementation of this project