Projects
There are 232 results.
BIPV-Booster - Game changer for façade-integrated PV systems: Development of proof-free constructions regarding fire protection
The central result of the project will be the development of a catalogue of “proof-free constructions” with regard to fire protection for façade-integrated photovoltaic systems, particularly for the more difficult case of high-rise buildings. These constructions will be defined in the project and tested in fire tests. The fire tests are to be supplemented by electrical and material-related module tests before and after the fire tests.
BOSS - Building Energy Systems on causal reasoning
The project develops novel Causal AI methods for automated fault detection in buildings. It aims to derive semantic structures from time series data and transparently model cause-effect relationships. This provides the foundation for scalable, explainable FDD solutions to reduce energy consumption and emissions in the building sector.
BTTAB - Broad-based testing of energy-efficient demonstration buildings with thermally activated building components
Buildings with thermal building component activation that have not yet been researched in as many federal states and application categories as possible will be monitored, which will include operating data as well as the experiences of those involved. The aim of this study is to take a general look at the various applications of the thermal building component activation technology and to evaluate and compare the pilot projects with the help of suitable evaluation criteria.
Baden climate neutral - Climate neutrality roadmap Baden near Vienna
The city aims to become climate-neutral by 2040.
Braunau 2040
The city of Braunau am Inn is one of the first Climate Alliance municipalities in Upper Austria, a long-standing member of a climate and energy model region and regularly implements measures and projects in the area of climate action and protection (energy concept, mobility concept, etc.). Together with the Climate Alliance Upper Austria, the municipality of Braunau am Inn would now like to develop a municipal climate neutrality roadmap with clear options for action for the coming years.
Bregenz 2040 climate neutrality roadmap focussing on the electricity and heating transition, mobility and public acceptance
The central goal of the project is to create a consistent, comprehensive, and feasible roadmap to achieve climate neutrality in Bregenz by 2040.
Build4Climate - Demonstration building with a climate room concept at the Innovation Quarter Lavanttal in Carinthia
Near the Wörthersee in Carinthia a modern open-space research and office building with flexible use is being built on the site of Lakeside Science & Technology Park GmbH. The innovative building will be implemented as a frontrunner with a 'climate room' concept based on thermal component activation and extensive use of renewable energy sources.
CELL4LIFE - Reversible SOCs as a link between electricity, heat and gas networks to increase the self-sufficiency and resilience of neighbourhoods
A system consisting of a solid oxide fuel cell and a Machine Learning-based control system for increasing efficiency and minimizing degradation is being developed. As a link between all energy supply networks, the system is intended to increase the self-sufficiency and resilience of plus-energy districts.
CEPA-Connect
The CEPA energy facade is an innovative building refurbishment system with an external active energy level. The aim is to revolutionize the refurbishment market. The development of the system focuses on holistic solutions for the thermal-energetic refurbishment of buildings.
CHALLENGE - Highly efficient use of hot gas and waste heat in air/water heat pumps for plus-energy buildings and quarters
CHALLENGE aims to further develop the system concept for air-to-water heat pumps in such a way that they can be used efficiently and without the above mentioned negative effects in densely built-up urban areas. In concrete terms, validated simulations and a functional model of the overall system on a laboratory scale are to be used to demonstrate that the concept can save 10% of electrical energy, reduce the noise of outdoor units in summer to a minimum and prevent the formation of local heat islands.
CO2 free Deutschlandsberg 2040
The city of Deutschlandsberg has set itself the goal of becoming climate-neutral by 2040 and is developing a climate neutrality roadmap to ensure climate-resilient urban development. This plan is also intended to combine the expected population growth, due to the commissioning of the Koralm railway at the end of 2025, while maintaining a high quality of life.
COOL-QUARTER-PLUS - GHG-neutral cooling of office and research quarters
Development of systems for the emission-neutral cooling of office, research and urban quarters on the basis of photovoltaic or geothermal energy supply and user integration. Life cycle cost calculations and analyses of grey and operational greenhouse gas emissions allow a holistic assessment.
Circular Bio Floor- Floor construction made from biomaterials
In this project biogenic building materials from wood industry waste and geopolymer binders are developed that can be used as tamped fill or 3D-printed dry-screed elements in timber construction. These materials offer functional benefits and an excellent eco-balance, contribute to the conservation of forests and enable the production of separable and reusable floor segment panels using digital manufacturing technologies. That significantly reduces the consumption of primary raw materials.
Circular Twin - A Digital Ecosystem for the Generation and Evaluation of Circular Digital Twins
By 2030, more than the equivalent of two Earths will be needed to meet the demand for natural resources, therefore a transition to circular systems is essential, especially in the construction industry. The digital "Circular Twin" ecosystem enables the early implementation of circular economy goals as well as end-to-end digitalization in construction utilizing Digital Twins, Generative Design Algorithms and Virtual Reality.
CircularBioMaterials
ParaStruct GmbH explores the technical and economic possibilities of recyclable, mineral-bound biomaterials in the project. The result is a basis for further development work and investments in this area.
City – Country – Climate: Four districts, one joint roadmap for a climate-neutral Gratwein-Straßengel
The aim is to initiate a structured and effective path towards climate neutrality 2035+ in the market town. In the context of the project, climate neutrality includes the topics of neighbourhoods and buildings, mobility and energy.
Climate Pioneer City Graz (KPS_Graz)
As an integral part of the ongoing Climate Change Mitigation Plan Graz process, the Climate Pioneer City Graz project with the Federal Ministry for Climate Action, Environment, Energy, Mobility, Innovation and Technology (BMK) will make a noticeable contribution to ensuring that the planned local processes and measures to achieve climate neutrality are implemented more quickly. This will be achieved primarily through the financing of additional climate protection experts in the city administration.
Climate Pioneer Districts Graz (KPQ Graz): Preparation of the climate-neutral districts ÖBB Eastern Railway Station and Smart City North-West
The Climate Pioneer Districts Graz (KPQ Graz) project is preparing the development of the districts "ÖBB Eastern Railway Station" and "Smart City North-West" in Graz towards climate neutrality. Based on the lessons learned of the evaluation of the already realised district "Smart City Graz", an innovative district concept is being created for the infrastructure topics of energy, mobility, green/open space and social sustainability. The central goal of the exploration is the subsequent realization of at least one of the two pilot quarters.
Climate Plan Spittal - Development of a climate neutrality roadmap for the city of Spittal an der Drau
The City of Spittal/Drau is already addressing the challenges of the future in many areas and through numerous initiatives (e.g. as part of a KEM and KLAR region, as an e5 municipality, with the adoption of a climate and energy mission statement in 2024, etc.). The city aims to maintain the quality of life both locally and regionally, and to continue ensuring high-quality urban living, working, and economic spaces. It recognizes that achieving this requires short-, medium- and long-term strategies across all climate-relevant sectors.
Climate Quarter Melk
Radical and comprehensive transformation of a city quarter in the small town of Melk, Lower Austria, involving the areas of urban planning, landscape architecture, traffic planning and co-creation - demonstrated by the implementation and rededication of a parking lot to an urban, inner-city climate forest within project life-time.