Demo Projects

There are 7 results.

Klimaneutrale Stadt

Kolpingquarter Salzburg - on site quarter energy supply with an optimized warmwater solution and grid serviceability

In a quarter on the site of the Kolpinghaus Salzburg, consisting of a youth residence and a hotel, energy optimizations and extensions are being carried out. This includes the construction of an affordable residential building for young people and families as well as the redesign of the overall energy supply of the neighborhood. The goals are to maximize the use of on-site renewable energy, phase out fossil fuel heat supply, interconnect the buildings, and optimize energy efficiency.

Klimaneutrale Stadt

ECO-Transformation - Energy transformation through community building, sufficiency and serial solutions using the example of the "Cottage District"

Combining technical and environmental-psychological expertise to develop a transformation process towards a climate-neutral neighbourhood based on the methods of community building, sufficiency potential and serial implementation solutions using the example of the Cottage Quarter. Preparation of the serial implementation of the developed solutions and the transformation process.

Klimaneutrale Stadt

FROSCHBERG 2.0 - Designing existing neighborhood(s) to be renewable and replicable

Exploration of replicable solutions for the socially acceptable transformation of existing neighbourhoods towards climate neutrality using the example of the Froschberg workers' housing estate. The result, the presentation and integration of climate neutrality into the refurbishment roadmap for the Froschberg workers' housing estate, serves as a starting point for implementation in a follow-up project.

Klimaneutrale Stadt

Decarb Alt Erlaa - Transformation of Alt Erlaa residential park into a climate neutral district

Exploration of a transformation of the Alt Erlaa residential park into a climate neutral district based on systematic potential analyses regarding structural measures, building technology measures and a sociological monitoring of the transformation process. The result of the exploratory study serves as a starting point for implementing the measures in a follow-up project.

Klimaneutrale Stadt

ResourceRevival - District development from industry site to resource neutrality in Möllersdorf

The reuse of building elements is a much-discussed topic, but a truly circular district encompasses much more. Through interdisciplinary cooperation as part of a co-creative concept development at the Werk Möllersdorf, previously separately considered aspects of the circular economy are combined, symbioses between demand and availability of materials, energy, rainwater and grey water are identified and their circularity is maximized.

Klimaneutrale Stadt

LeiSan - Flagship Project: Renovation of the Komposch-Ebene Residential Quarter in Bad Eisenkappel, Carinthia

Exploration for an existing quarter in Bad Eisenkappel with the goal of renovating the building stock, involving the residents, the open space, mobility, and local generation of renewable energy. The result should demonstrate the economic feasibility of a holistic concept for the quarter and serve as a basis for a demonstration project.

Klimaneutrale Stadt

Smart Dag - smart and climate-neutral renovation of the Dag Hammarskjöld housing estate

For a smart and sustainable renovation of the Dag Hammarskjöld housing estate in the city of Klagenfurt, a residential area from the 1950/1960s, the existing housing stock (buildings, green and open space, social structure) will be analysed and assessed based on the "Quartier &Wir" guide. The results are the basis for the launch of an architectural competition. The residents of the area who still live on site and the housing development agency of the department of the provincial Carinthian Government are involved in the feasibility study. The aim is to transfer the results of the study to other renovation projects and thus contribute to achieving the city of Klagenfurt's climate goals.